Deschutes County building permits: what to expect and how we file yours

You bring the plans; we file and respond to Deschutes County. A real person calls you within 24 business hours.

Building permit package submittals: from $750. Includes a SiteFacts Report. The site plan is not included.

Submitted within 5 business days of complete information, including your SiteFacts Report. Every correction round is at no added fee.

Hand unrolling a residential site plan on a wooden desk

In unincorporated Deschutes County, building permits for a new home come from the Building Safety Division of Community Development, the Deschutes County building department. On an existing lot without sewer, the county requires a septic site evaluation first. For access onto a county road, a driveway access permit precedes a new home permit. Confirm with Deschutes County.

Who issues which permits in Deschutes County?

PermitOfficeApply
Building permit, new homeBuilding Safety DivisionOregon ePermitting
Septic: site evaluation, installationOnsite Wastewater DivisionOregon ePermitting
Driveway onto a county roadRoad Department reviewsOregon ePermitting
Zoning and land usePlanning DivisionEmail a PDF package

Cities in this county

CityBuilding permits issued byLink
BendCity of Bend Building Safety DivisionBend permit guide
RedmondCity of Redmond. Confirm with the City of Redmond.Oregon BCD directory
SistersDeschutes County Building Safety. City of Sisters does planning inside city limits.County inspections page
La PineDeschutes County Building Safety. City of La Pine does planning inside city limits.La Pine permit guide

What are the steps for a Deschutes County building permit?

  1. Check the lot.

    Just verify lot of record and land use status with Planning (checklist).

  2. Settle septic, if no sewer.

    On an existing lot, a site evaluation precedes any building permit (checklist).

  3. Get the driveway access permit.

    For access onto a county road, it precedes new dwelling permits (Driveway Information Sheet).

  4. Apply for the building permit.

    Fees are invoiced once staff deems it complete (application guide).

  5. Planning and building review.

    Building review needn't wait for planning (processing times).

  6. Inspections and final.

    The certificate of occupancy needs any driveway and septic permits finaled, system development charges (SDCs) paid, and city approval in La Pine or Sisters (requirements).

What fees should you plan for in Deschutes County?

As printed in the county's FY 27 CDD Fee Schedule (the schedule's pages are marked "FY 2027 Proposed").
ItemAmount
Structural plan check65% of the building permit fee
Transportation SDC, single family home$4,563.00
Septic site evaluation, single family dwelling$1,327.00

Fees change. Confirm current amounts with Deschutes County before you budget.

How long do Deschutes County permits take?

What catches people building in Deschutes County?

Wildfire hardening applies to new dwellings

R327 (Oregon's wildfire-resistant building rules) is required on new dwellings and new accessory structures from April 1, 2026, in unincorporated Deschutes County and Sisters, not remodels or additions. Small accessory buildings may be exempt (county R327 page).

Septic decides the order

On an existing lot without sewer, a site evaluation precedes any building permit, and it can't be done on frozen or snow-covered ground (county checklist).

South county septic can need nitrogen reduction

For a new system or major repair in southern Deschutes County, the county says this typically means nitrogen-reducing technology (county page).

Confirm each item with Building Safety: (541) 388-6574.

In our experience, plan septic first, land use second, building third. The septic result can change the design, so get it before final plans.

In our experience, pull the permit, septic and land use history before you design. Old approvals, such as a prior Landscape Management decision or an old septic record, changed the path on at least five of our projects.

A La Pine mailing address doesn't put a lot inside the City of La Pine. In our experience, a recent south county project with one got its land use and building permits from the county. Check city limits first.

On a lot outside a city, a SiteFacts Report covers its soils, utilities, zoning and permits before you commit.

If you own vacant land here and plan a house and a shop, our land owner's guide covers septic, setbacks and the county's shop rules.

Some HOAs, The Ridge at Eagle Crest among them, require design approval before the county building permit (RECOA guidelines). Confirm with your HOA. Our Central Oregon HOA design review guide explains them.

Open rural Deschutes County lot with sagebrush, bunchgrass, lava rock and western junipers beside a gravel road, with snowcapped Cascade peaks on the horizon.

How do we file a Deschutes County permit?

  1. We start with an intake review. If your project needs a planning application, HOA review or anything else outside our services, we flag it early.
  2. Every building permit package starts with a SiteFacts Report.
  3. If Deschutes County asks for something else, we respond and resubmit.

We file building permits in unincorporated Deschutes County. We do not file land use applications, which go through county Planning. Nonfarm dwellings in exclusive farm use (EFU) zones, wetland work and some Landscape Management reviews can be in that group. Confirm with Deschutes County.

Basic site plans for unincorporated lots: from $500.

Before we file in Deschutes County, plan for:

"I am so grateful Don was available to assist us with the permitting process for our new home and shop."
Heather, five-star Google review
Read our Google reviews

Builders who work with us: Simplicity Homes, HiLine Homes and JF Homes.

Questions

Who issues building permits in unincorporated Deschutes County?
The Building Safety Division issues them through Oregon ePermitting. Zoning and land use go to county Planning by email, not through ePermitting. Confirm with Deschutes County.
What do you need before you apply for a county building permit?
A legal lot of record, any land use approval, a septic site evaluation if an existing lot has no sewer, and, for access onto a county road, a driveway access permit (research checklist). Plans go in as PDFs; the county doesn't accept ZIP files (application guide).
Does Deschutes County require wildfire-resistant construction?
Yes, for new dwellings and new accessory structures beginning April 1, 2026, in unincorporated Deschutes County and the City of Sisters. It doesn't apply to remodels or additions, and small accessory buildings may be exempt (county R327 page). Confirm with Building Safety.
Do I need a septic site evaluation before a building permit?
The county says a site evaluation is required before any onsite wastewater or building permits can be issued for existing lots (checklist). It targets 30 days for evaluations but state rules set no deadline. Confirm with the county.
Do I need a driveway permit in Deschutes County?
For access onto a county road, the county says a permit must be obtained before building permits are issued for new dwellings, replacement dwellings or accessory structures (Driveway Information Sheet). Confirm with the county.
When do you pay Deschutes County building permit fees?
The county invoices initial fees once staff deems the application complete (application guide). In our experience, that first invoice is only part of the total, and the balance is calculated when the permits are ready to issue. Budget from the county's fee schedule so the final number isn't a surprise. Confirm with Deschutes County.
Can you build an ADU on rural land in Deschutes County?
On some lots: the county's ADU research checklist limits rural ADUs to the RR-10, MUA-10, UAR-10, SR-2 1/2 and WTZ zones, on lots of 2 acres or more, or 5 acres or more in south county. The ADU must sit within 100 feet of the main house, and a septic site evaluation comes before the land use application. The county also says owners who build one can't use the house or the ADU as a vacation rental. A rural ADU needs a Planning ADU permit, which we don't file, so confirm your lot with Deschutes County Planning first.
Does Sand & Sage prepare site plans in Deschutes County?
Yes, for most unincorporated lots. Basic site plans are from $500 and are not included in the permit package. They are drawn from county records and your information, not a survey and not engineered. Sun Country Engineering & Surveying is a typical referral for engineered work.

Hand off the permit work.

Tell us about your project. A real person calls you within 24 business hours. We file your application with the plans and documents you provide, and we answer the county's corrections.

Permit fees are paid to the county or city.

Sand and Sage SolutionsTerrebonne, OR(541) 316-0371Monday to Friday, 8:00 AM to 5:00 PM

Last reviewed: November 2026

Fees and rules change. Confirm with Deschutes County Building Safety, (541) 388-6574.